Previous versions of this document are available under the Product Family tab.
Guideline 1.1-2007 represents a revision of ASHRAE Guideline 1-1996, which contained both general commissioning process requirements and HVAC technical requirements in one document. The technical commissioning process requirements for different building systems are now being developed in individual discipline technical guidelines, separate from the commissioning process requirements that are defined in Guideline 0-2005.
Although Guideline 1.1 focuses upon HVACR systems, a successful total building commissioning process will carefully validate interfaces and possible interferences between all building systems. Even when HVACR is the primary focus of the commissioning process, coordination among disciplines is essential for success. Annexes are included in this guideline to assist in the implementation of the commissioning process to HVACR systems and assemblies. The annexes are based upon actual project experience, with details based upon current practice, and they illustrate application of the commissioning process to a variety of HVACR systems and equipment.
Units: I-P
Citation: ASHRAE Guideline
Product Code(s): 86812,D-86812
This product references:Guideline 8-1994 -- Energy Cost Allocation for Multiple-Occupancy Residential Buildings
Guideline 12-2000 -- Minimizing the Risk of Legionellosis Associated with Building Water Systems
This product replaces:Guideline 1-1996 -- The HVAC Commissioning Process
Browse Product Family:ANSI/ASHRAE Guideline 1.1-2007 Errata (July 2, 2012)
ANSI/ASHRAE Guideline 1.1-2007 Errata
Guideline 1.1-2007 -- HVACR Technical Requirements for The Commissioning ProcessGuideline 1-1996 -- The HVAC Commissioning Process
People Who Bought This Also Bought:ASHRAE - Guideline 0-2005 -- The Commissioning ProcessASHRAE - Guideline 4-2008 -- Preparation of Operating and Maintenance Documentation for Building SystemsANSI/ASHRAE 62.1-2010- Standard 62.1-2010 -- Ventilation for Acceptable Indoor Air Quality (ANSI Approved)ASHRAE - Guideline 11-2009 -- Field Testing of HVAC Controls ComponentsANSI/ASHRAE 90.1-2007 (I-P)- Standard 90.1-2007 (I-P Edition) -- Energy Standard for Buildings Except Low-Rise Residential Buildings (ANSI Approved; IES Co-sponsored)ANSI/ASHRAE 189.1-2009- Standard 189.1-2009 -- Standard for the Design of High-Performance Green Buildings (ANSI Approved; USGBC and IES Co-sponsored)ASHRAE 62.1-2007- Standard 62.1-2007 -- Ventilation for Acceptable Indoor Air Quality (ANSI Approved)ANSI/ASHRAE 55-2004- Standard 55-2004 -- Thermal Environmental Conditions for Human Occupancy (ANSI Approved)ANSI/ASHRAE 100-2006- Standard 100-2006 -- Energy Conservation in Existing Buildings (ANSI/IES Approved)ANSI/ASHRAE 180-2008- Standard 180-2008 -- Standard Practice for Inspection and Maintenance of Commercial Building HVAC Systems (ANSI/ASHRAE/ACCA Approved)
View Contents (PDF)