ACI 351.4M-14

ACI 351.4M-14 Specification for Installation of Cementitious Grouting between Foundations and Equipment Bases (Metric)

standard by American Concrete Institute, 12/01/2015

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$18.27 tax incl.

$42.50 tax incl.

(price reduced by 57 %)

1000 items in stock

Full Description

This specification covers minimum requirements for cementitious grouting between foundations and equipment bases. Included are requirements for materials and placing.

Contact us